• An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow

AACD Blog

Aurora Mission Critical is a 150 acre parcel on which environmental testing as well as flexible planning and engineering have been completed by RTKL Associates specifically for Data Center or Mission Critical operations looking for a site to construct their next project on. Our site offers:

Diversely Fed Power at 4.0 cents per kw/hr with 55% non-CO2 emitting generation sources

- Diverse Fiber providers including AT&T, Verizon, Qwest, Level 3 Communications, Sprint and Pinpoint

- Diverse Water on site with municipal supply as well as private well accessing the abundant Ogallala Aquifer (80 feet to water, 200+ foot saturation)

- Free Cooling with over 5000 hrs water side and 7000 hrs air side for sustainable cost savings

- Zoned I80X specifically including data centers

- Incentives Geared Towards data centers, cloud computing and high technology companies

- Large Parcel provides great setbacks, 1 hour from major metro area for additional safety but still close to skilled workforce

Aurora, Nebraska - look no further... for your next construction ready data center build site needs!



Aurora Mission Critical Cost Savings
Going Green with your data center in Aurora, not only makes environmental sense but also makes good business sense with the cost savings that can be had. Linked here are several pages from a general macro-engineering report that RTKL Associates prepared. There are significant savings to be realized when employing variations of air side and water side free cooling. Also included is information on utilizing the onsite well accessing the abundant Ogallala aquifer. Sustainable Savings
 
Aurora Mission Critical Materials

The Aurora Mission Critical project has created several marketing pieces to help convey pertinent information about the site. The pdf link below gives you a general overview of the construction ready 150 acre site. If you would like more detailed information, please call Christian Evans at 402-694-6911.

Four Page Brochure

Additional Materials Available Upon Request:

- AMC Macro-engineering Study - Prepared by RTKL Associates, a 29 page study on sustainable savings, use of the aquifer and potential engineering for the project

- AMC Property Development Study - Also prepared by RTKL Associates, 38 pages of detailed information on the property, geology, environment, fiber, electric builds, etc...

- AMC Project Data Book - 130 page project data package

 
Aurora Mission Critical Incentives

Besides the obvious cost savings associated with locating in Aurora, the state of Nebraska has developed an agressive incentives program based on investment and job creation.

A recent update to the incentive package, specifically creates advantages for data centers and high technology companies. The Nebraska Advantage Brochure can be found here http://www.neded.org/files/advantage/NEAdvantage_NOV_2010_WEB.pdf .

The Nebraska Advantage Tax Calculator can be used to find out approximately how much savings your company can expect when settling in the state. It can be found here http://www.neded.org/files/businessdevelopment/2011_NE_Advantage_Benefit_Calculator_11_30_10.xls .